Application Forms and Additional Resources
Spring 2024 Funding Round: Feb. 27 through April 30
The Spring 2024 Funding Round runs Feb. 27 through April 30, 2024
Application deadline is April 30, 2024 (5:00 p.m.)
Completed applications are submitted online: Spring 2024 Application for Funding
Application training materials are available here
The Spring 2024 funding round opens on Feb. 27. The application deadline for the Spring 2024 funding round is April 30, 2024. Lead Service Line Replacement (LSLR) funding applications are open year-round.
Applicants for drinking water, wastewater, stormwater, and emerging contaminants (PFAS) funding should review the application forms and guidance documents. Additional support materials, including recordings of application training sessions are available.
Application training
Completed applications are submitted online:
Spring 2024 Application for Funding
Please note (For AIA/MRF grants only): When applying for an asset inventory and assessment (AIA) or merger/regionalization feasibility (MRF) grant: two fields for upload (Priority Rating System Scorecard and Affordability calculator) are listed as required submissions. However, they are not required. For AIA and MRF applications, please submit an "N/A" PDF for these two fields to complete the upload.
The Spring 2024 funding round opens on Feb. 27. The application deadline for the Spring 2024 funding round is April 30, 2024. Lead Service Line Replacement (LSLR) funding applications are open year-round.
Spring 2024 Forms for Drinking Water , Wastewater and Stormwater Funding Applications
Spring 2024 Application for Funding (this version includes instructions- the online submittal link is on page 8). To apply for water, wastewater and stormwater funding, start with this form (or complete the application form for Lead Service Line Replacement (LSLR) project funding (below). Please note (For AIA/MRF grants only): When applying for an asset inventory and assessment (AIA) or merger/regionalization feasibility (MRF) grant: two fields for upload (Priority Rating System Scorecard and Affordability calculator) are listed as required submissions. However, they are not required. For AIA and MRF applications, please submit an "N/A" PDF for these two fields to complete the upload.
Spring 2024 Lead Service Line Replacement (LSLR) Project Application form and instructions (Revised March 2024)
Spring 2024 Resolutions by Governing Bodies for Funding (Required in all applications) (Feb. 2024)
Spring 2024 Water / Wastewater Grant Eligibility and Affordability Calculator
Spring 2024 Fund Transfer Certification Form (Feb. 2024)
Spring 2024 LASII LGU Indicator Calculator for Stormwater Funding Eligibility
Spring 2024 LASII Stormwater Funding Eligibility Certification Form For LASII Funding Only (Feb. 2024)
Financial Information Form (July 2023)
Spring 2024 Priority Rating System Forms and Guidance are in the “Priority Rating Systems, Guidance Documents” tab above this ‘forms’ section. Additional forms required in CDBG-I applications are in the “CDBG-I Additional Forms” tab above this ‘forms’ section.
Priority Rating Systems (PRS) Forms and Guidance Documents
The Spring 2024 funding round opens on Feb. 27. The application deadline for the Spring 2024 funding round is April 30, 2024. Lead Service Line Replacement (LSLR) funding applications are open year-round.
Spring 2024 Construction Project Guidance Feb. 2024 (For Construction & Pre-Construction Projects) (NOT for Lead Service Line Replacement (LSLR) projects)
Spring 2024 CDBG-I Priority Rating System and Guidance Feb. 2024
Spring 2024 LASII Stormwater Construction Priority Rating System and Guidance Feb. 2024
Spring 2024 MRF Priority Rating System Guidance Feb. 2024
Spring 2024 AIA Priority Rating System Guidance Feb. 2024
Supplemental Guidance for Additional Consideration
LSLR Guidance and PRS July 2023 (For Lead Service LIne Replacement (LSLR) Projects)
Additional Guidance for CDBG-I (Community Development Block Grant-Infrastructure)
Spring 2024 CDBG-I Interactive Score Card
Appendix A Determining LMI Revised 7/2023
Appendix B Public Hearings Updated 2/26/24
Appendix C HUD Forms Instructions Updated 5/2022
HUD CPD 17-12 Floodway Notice Updated 5/17/21
ADDITIONAL FORMS FOR CDBG-I APPLICATIONS
TAB 1
Resolution by Governing Body of Applicant Updated 8/10/2022
TAB 2
Commitment of Other Funds Updated 3/20/17
TAB 3 (Low-to-moderate Income Documentation)
Income Survey Questionnaire Updated 5/3/21
Income Survey Questionnaire (Spanish) Updated 5/10/19
Income Survey Questionnaire Instructions Updated 3/20/17
Income Survey Questionnaire Instructions (Spanish) Updated 3/20/17
Income Survey Sample (1) Updated 3/20/17
Income Survey Sample (2) Updated 3/20/17
Income Survey Summary Updated 5/3/21
2023 Income Limits Modified 8/3/23
HUD Area-Benefit LMI Census Data
TAB 6
Asset Management Plan Guidance Updated 2/22/17
Water & Sewer Rate Form Updated 3/20/17 (Only required for CDBG-I applicants)
TAB 8 (Federal Compliance Documents)
Public Hearing Notices under COVID-19 Added 9/14/20
Public Notice for Hearing Updated 8/12/21
Public Notice for Hearing - Spanish Updated 5/10/19
Public Hearing Script Updated 8/12/21
Public Hearing Minutes Template Updated 8/12/21
Certification of Understanding Roles and Responsibilities Updated 3/20/17
Certification Regarding Debarment, Suspension, and Other Responsibility Matters
Conflict of Interest Disclosure Updated 3/20/17
Federal Performance and Procurement Requirements Certification Updated 3/20/17
Disclosure Report Updated 3/20/17
Economic Need- Infrastructure National Objective Form and Instructions Updated July 20, 2022
IDIS Forms and Instructions Updated July 20, 2022
RESOURCES
LGU Indicators- Census Places and Counties (2021) Updated 8-21-23*
*Datasets include poverty rates and median household income
Water and Wastewater Utility Asset Assessment Guidance (2022)
Engineering Services Procurement for ARPA-Funded Projects
Supplemental Guidance for Bulk Connections
Guidelines for Sampling Individually-Owned Wells